  1. NowOne failed upload clears every document in the batch. Applicants start again or leave.EngineeringUpload documents · 31% of applicants stop here
    Finding 1 of 5, opened. Every row has this behind it.
    Where
    Upload documents, step four of six. One screen, three states reviewed: empty, partly uploaded, failed.
    What happens
    The batch goes up as one request. If one file fails the size or type check, the response clears all of them and the screen shows a generic error that names no file.
    Evidence
    31% of applicants who reach this step never submit, from your analytics over the last ninety days. Nine of the fourteen support tickets tagged upload in September describe uploading everything twice. Two of the three analysts said they ask applicants to email the documents instead.
    Fix
    Keep every file that passed. Name the one that did not and say why. Let it be replaced on its own. Show the size and type limits before the first upload rather than after.
    Effort and week two
    Engineering, two to three days, no design system change. This is the first screen the prototype builds, with the real states: partial failure, retry, submitted.
  2. Now“Ultimate beneficial owner” is asked with no explanation, so sole traders guess.DesignOwnership · 2 of 3 support tickets this month
  3. NextAnalysts re-key company details the applicant already entered.ProductReview queue · about 6 minutes a case
  4. NextKeyboard focus is lost when the address lookup closes.EngineeringBusiness details · WCAG 2.4.3
  5. LaterStatus emails don’t say what the applicant has to do next.DesignEmail · low volume, high frustration

Shortlist for weeks two to four: the first three, built as one journey from business details to submitted. Walked through with your team on Friday, one hour.

The five days behind it

  1. Day 1

    Access plus a walkthrough of the product with whoever owns it. The decision you need to make, written down.

  2. Days 2 and 3

    In the product screen by screen, with your analytics, support tickets and release notes open beside it.

  3. Day 4

    Every finding written up with its evidence and ranked now, next and later. The shortlist comes off the top.

  4. Day 5

    The report plus an hour with your team to walk it through and agree what weeks two to four build.

The full report runs to about twelve pages: every finding with its evidence, a screen-by-screen map, the shortlist with a scope for each item and the recording of the Friday walkthrough. The sheet above is its summary page.

Discuss week one

$2,000£2,000 ex VAT, five working days. Credited in full against a prototype if you carry on.